A procurement lead who needs ESG reporting and an engineer who counts cooling kilowatt-hours usually ask the same thing in different words: can you check a “green” data center before signature. On the Akashi Data Center campus in Astana (street C316, site 7) that check has a finite set: design cooling modes, the ESG page, the policy and a complaints procedure.
Phase one opens in May 2027. Until that date the conversation is a reservation of configuration. Tell the team which disclosures your reporting needs, together with the placement format.
Where a data center’s energy goes
Servers draw power. Cooling, UPS, distribution and lighting draw more. The denser the rack, the more heat you have to move — and the more cooling shows up in the bill.
For the client this is a line on the bill. In the TCO structure power is the standing part of the payment, and PUE (total facility energy over IT energy) flows through to cooling and engineering. Closer to 1 means a smaller infrastructure tax. Ask the team for a calculation against your kilowatts and cooling mode.
Free cooling and hybrid: a design target
Astana’s climate lets the hall use outside air for much of the season — free cooling. When the street is not cold enough, a hybrid mode works with the chillers. Those modes are sized to cut energy use by up to 40% versus a conventional scheme.
That is a design target: lock it in the contract and verify it after launch. Earlier writing on sustainability is in green engineering. How modules and a liquid loop meet density is in high density and liquid cooling. Liquid cooling is tied to DC-4.
ISO 14001 and documents procurement can take today
There is no constructed-hall certificate yet: ISO 14001 alignment is part of the campus standard set; procurement can put it in the request together with the policy.
What you can request now, without waiting for May 2027:
- The ESG Policy — the full document: principles, governance structure, procedures. The Management Board approved it (minutes ADC-2026-94, 19 August 2026). There are Russian and Kazakh versions; write to the team if you need another language version.
- The complaints-review procedure — an approved process.
- The feedback form: inquiries from employees, partners, local communities and other stakeholders are read and answered.
Three pillars sit next to those files: lower impact and rational resource use; safety of employees, contractors and partners as a baseline; process transparency and accountability in decisions. That is a governance frame alongside power and cooling engineering.
What to ask for in the contract
The request and the contract are where client reporting later has to live: power sources and the reserve scheme (two 110 kV feeds, UPS, generators — the same campus contour as in data center power); which cooling modes are locked; which disclosures and metrics you need after launch.
Phase one is May 2027. Until opening you reserve the format (cabinet / cage / hall) and the engineering. Build context is in the Astana campus and construction progress.
Uptime TCDD Tier IV certifies the design documents of phase one, not a constructed hall. The TCCF audit is April 2027. TCDD is not TCCF. TCDD does not make ESG metrics measured.
The form is contacts, consultation block. It helps to name: format and rack count; whether you need density above 20 kW per cabinet; which documents and disclosures procurement requires; the date relative to May 2027. Sales replies within one business day, runs a pre-qualification and a capacity check, and sends a proposal with prices, timelines and technical detail. An NDA is available on request. Email and phone: sales.department@akashi.cloud, +7 700 810 3010.
Need energy efficiency and ESG for colocation in Kazakhstan checked before signature? Leave a request — we will go through cooling, documents and the reservation before May 2027.
Frequently asked questions
Does free cooling already cut energy use by 40% in a live hall? Free-cooling and hybrid modes are designed to cut energy use by up to 40% versus a conventional scheme. That is a design target; the operating-hall passport follows after launch.
Does the constructed hall hold an ISO 14001 certificate? There is no hall certificate yet: ISO 14001 alignment is part of the campus standard set. TCDD confirms the phase-one design. TCDD is not TCCF.
Which ESG documents can you request? The Akashi ESG Policy — PDFs in English, Russian and Kazakh, approved by the Management Board (minutes ADC-2026-94, 19 August 2026). Next to it, the complaints-review procedure (PDF). A feedback form sits next to the policy.
What should land in the contract for the client’s reporting? Power sources and the reserve scheme, cooling modes, and which disclosures will be available after launch. Until May 2027 this is a configuration reservation. Agree the metrics you need with the team.
Is the Akashi hall already running as a green data center? No. Phase one is May 2027. ESG is built into design, construction and future operations. TCDD does not mean the hall is handed over and metrics are already counted. TCDD is not TCCF.