Skip to content
AKASHI Data Center
A section of the DC that's only yours.
IT space rental

Private Cage

A dedicated section of the server room with enhanced perimeter security and customizable configurations tailored to your business.

Enhanced security Isolated environment Flexible rack configs
Request a quote
Benefits for your business

A section of the DC that's only yours.

01

Security perimeter

Enhanced perimeter protection with customized access control and flexible configuration.

02

Stable operation

Uninterrupted performance of your IT infrastructure.

03

Dedicated power

Guaranteed power delivery tailored to the needs of your Cage.

04

Flexible deployment

Support for standard and non-standard server cabinets of any size.

05

Private access zone

Dedicated, isolated section accessible only to your authorized personnel. 24/7.

Technical specifications

11 hectares.
Built for tomorrow's workloads.

The Akashi campus hosts data centers, office and warehouse facilities, plus EV charging stations. The infrastructure operates 24/7.

Land area
11 hectares
Built area
60,000 m² (4 DC buildings)
Administrative building
6,000 m²
IT load capacity
28 MW
Raised floor height
1.6 m
Floor load capacity
2 tons / m²
Loading terminals
Two with freight elevators
Core engineering systems

Innovative solutions for power, fuel, and security.

Power

  • 2 independent power supply entries
  • Active/active sources with 110 kV redundancy
  • Dual electrical redundancy per building
  • UPS with 5/4N redundancy, 10-min battery backup

Backup & fuel

  • Backup generators — 12 hrs autonomy at full load
  • 2 fuel suppliers, 4-hour delivery SLA
  • Automatic failover and load-balancing

Fire & security

  • Triple-layer fire detection with gas suppression
  • Dual redundancy on all suppression systems
  • Multi-perimeter access control, 24/7 CCTV
Submit a request

We reply within one business day.

Questions about colocation, partnership, or the project? Reach out however suits you.

form
Progress updates

Quarterly reports from the build site —
direct from the engineering team.

Commissioning milestones, capacity releases, and Tier IV certification progress. Short, substantive, zero marketing — one email per quarter.

  • 01 Construction and commissioning milestones, with dated evidence.
  • 02 Capacity releases — racks and MW opening for reservation.
  • 03 Uptime Institute audit status and certification timelines.
telemetry
live
site power
48.34
MW
racks reserved
2,576 / 4,224
61%
optical entries
4 / 4
redundant
tier IV audit
490
days remaining

One quarterly email. See our Privacy Policy .