Skip to content
AKASHI Data Center
Reliable colocation without capital expenditure.
IT space rental

Server Cabinet Rental

A cost-effective solution for companies needing reliable infrastructure without capital expenditures. Fast deployment and 24/7 support.

Up to 20 kW / rack Secure access Scalable 1 → 1,000+
Request a quote
Benefits for your business

Reliable colocation without capital expenditure.

01

Fully equipped rack

1200 mm-wide cabinet with coded access, dual PDUs, and support for high-density loads up to 20 kW.

02

High-density power

Supports workloads up to 20 kW per rack.

03

Scalable capacity

From 1 to over 1,000 cabinets.

04

Physical security

Controlled and protected access to each rack.

05

Infrastructure uptime

Continuous operation of your systems.

Technical specifications

11 hectares.
Built for tomorrow's workloads.

The Akashi campus hosts data centers, office and warehouse facilities, plus EV charging stations. The infrastructure operates 24/7.

Land area
11 hectares
Built area
60,000 m² (4 DC buildings)
Administrative building
6,000 m²
IT load capacity
28 MW
Raised floor height
1.6 m
Floor load capacity
2 tons / m²
Loading terminals
Two with freight elevators
Core engineering systems

Innovative solutions for power, fuel, and security.

Power

  • 2 independent power supply entries
  • Active/active sources with 110 kV redundancy
  • Dual electrical redundancy per building
  • UPS with 5/4N redundancy, 10-min battery backup

Backup & fuel

  • Backup generators — 12 hrs autonomy at full load
  • 2 fuel suppliers, 4-hour delivery SLA
  • Automatic failover and load-balancing

Fire & security

  • Triple-layer fire detection with gas suppression
  • Dual redundancy on all suppression systems
  • Multi-perimeter access control, 24/7 CCTV
Submit a request

We reply within one business day.

Questions about colocation, partnership, or the project? Reach out however suits you.

form
Progress updates

Quarterly reports from the build site —
direct from the engineering team.

Commissioning milestones, capacity releases, and Tier IV certification progress. Short, substantive, zero marketing — one email per quarter.

  • 01 Construction and commissioning milestones, with dated evidence.
  • 02 Capacity releases — racks and MW opening for reservation.
  • 03 Uptime Institute audit status and certification timelines.
telemetry
live
site power
48.34
MW
racks reserved
2,576 / 4,224
61%
optical entries
4 / 4
redundant
tier IV audit
485
days remaining

One quarterly email. See our Privacy Policy .