AKASHI Data Center
Live status · Astana campus
Construction progress

Building Central Asia's
first Tier IV data fortress.

We update the world on every phase — from foundation to certification. 11 hectares of purpose-built infrastructure under construction in Astana.

Current snapshot

Foundation complete. First buildings rising. Pipeline 105% filled.

Campus area
11 hectares
Total build area
60,000 m²
DC buildings
4
IT load (phase 1)
5.28 MW
First-phase launch
May 2027
Pipeline
105%
AKASHI Tier IV data center — Astana
Akashi Astana campus — aerial
Akashi data hall interior
Akashi campus entrance — green corridor

Project timeline

  1. Oct 2025

    Land preparation complete

    Site grading, access roads, and utility tie-ins finalized on the 11-hectare Astana campus.

  2. Nov 2025

    Foundation poured

    Reinforced concrete foundation laid for the first DC building.

  3. Dec 2025

    Structural erection

    Primary structural steel and envelope going up on building 1.

  4. Jan 2026

    Uptime Institute audit

    Tier IV (TCDD) certification process begins.

  5. Feb 2027

    MEP rough-in

    Cooling headers, power distribution, and fire suppression being installed.

  6. Mar 2027

    Commissioning works

    Comprehensive testing and tuning of all engineering systems before DC handover.

  7. Apr 2027

    Uptime Institute audit

    Tier IV (TCCF) certification process begins.

  8. May 2027

    First phase soft-launch

    Initial server halls handover to anchor tenants.

  9. 2027+

    Expansion to 100 MW

    Additional DC buildings come online. Full 4,224-rack capacity.

Submit a request

We reply within one business day.

Questions about colocation, partnership, or the project? Reach out however suits you.

form
Progress updates

Quarterly reports from the build site —
direct from the engineering team.

Commissioning milestones, capacity releases, and Tier IV certification progress. Short, substantive, zero marketing — one email per quarter.

  • 01 Construction and commissioning milestones, with dated evidence.
  • 02 Capacity releases — racks and MW opening for reservation.
  • 03 Uptime Institute audit status and certification timelines.
telemetry
live
site power
48.34
MW
racks reserved
2,576 / 4,224
61%
optical entries
4 / 4
redundant
tier IV audit
490
days remaining