Situated on 11 hectares in a developed industrial area of Astana, it has its own power transmission line and 110/10 kV substation (63 MVA installed, specifications for 42 MVA received).
Four independent enclosures
with 4,000 server racks for unprecedented scalability and redundancy.
Administrative building